BG25


Features and advantages: 1. Flexible and versatile, it can meet the construction requirements of up to 2-meter diameter holes; 2. The power head adopts a double motor reduction configuration, with large torque and high speed; 3. The multi-point forced lubrication system ensures reliable operation and long service life; 4. The drilling rig has a low center of gravity and good construction stability of the whole machine; 5. The whole machine can be transported with a pole and can be transported by an ordinary transport vehicle;

BG26


Features and advantages: 1. Advanced hydraulic power system, suitable for construction under various geological conditions; 2. High-strength structural steel and optimized design to ensure long-term stability under complex geological conditions; 3. Optimize hydraulic system and power configuration to reduce construction and operation costs; 4. Compact equipment design to adapt to changing construction needs; 5. Efficient digital control system to improve work efficiency and safety;

BG36


Features and advantages: 1. Powerful power system and high torque output, capable of coping with complex geological conditions; 2. Optimized hydraulic system and main winch design to improve operating efficiency; 3. Efficient power distribution system and hydraulic system, achieving higher fuel efficiency and reducing operating costs; 4. High-strength steel and optimized design to extend equipment life; 5. Efficient digital control system to improve work efficiency and safety;

BG38


Features and advantages: 1. Optimize the power system and hydraulic system to efficiently complete large-diameter pile hole construction; 2. Can cope with geological conditions such as soft soil, clay, sand and weathered rock of a certain hardness; 3. Digital control system for easy equipment management and real-time adjustment; 4. The body is made of high-strength steel to adapt to the workload during deep hole drilling; 

SR65


Features and advantages: 1. Small size, low center of gravity, flexible and reliable walking; 2. Can be transported with pole, convenient for transfer; 3. The main winch wire rope is wound in a single layer, with a long service life; 4. New electric control system, intelligent functions improve construction efficiency;

SR155


Features and advantages: 1.High efficiency, energy saving, high reliability; 2.Intelligent control; 3.Applicable to small and medium-sized soil pile hole construction; 4.Energy saving and fuel saving of 10%~15%; 5.The whole machine weighs 48 tons and is easy to transport;

SR205


Features and advantages: 1. Small-hole deep pile construction in civil engineering and other scenes, with high construction efficiency; 2. Telescopic wide chassis with high stability; 3. Large-displacement electronic fuel injection engine with power optimization technology, economical and energy-saving; 4. Adopting a new generation of drill rod, the overall strength is increased by 25%;

SR215


Features and advantages: 1. Advanced power system and hydraulic technology to improve construction efficiency; 2. Optimize power distribution and save more than 10% fuel; 3. Intelligent control system to improve construction accuracy and safety. ; 4. Applicable to a variety of geological conditions;

SR220C


Features and advantages: 1. Intelligent power distribution technology improves operation economy; 2. The fuselage is made of high-strength steel to improve overall durability; 3. Intelligent control system improves construction accuracy and safety; 4. The whole machine is compact in design and suitable for rapid transfer;

SR235


Features and advantages: 1. EP control upgrade, performance improved by 15%; 2. Adopt power optimization control technology, energy saving 10%~15%; 3. Wire rope pre-tensioning technology, life increased by 30%; 4. High-standard design of parts, strong and durable;

< 1234...12 > proceed page

Get A Quote

Leave your contact information and get a free product quote